Treat and discharge 3,000,000 gallons of water from a pipeline hydrotest on the North Slope of Alaska. Protected America’s last frontier while minimizing costs.

Treat and discharge 3,000,000 gallons of water from a pipeline hydrotest on the North Slope of Alaska. Protected America’s last frontier while minimizing costs.
A chemical plant in Texas required a 24,000 barrel tank to be degassed during, and following a tank cleaning. Degassing Tanks under a Nitrogen Blanket Not a Problem for Envent.
During a pipeline re-commissioning a leak was detected requiring 12,000 barrels of propane needing to be combusted. By using the vapors in two ways, the time to depressure the pipeline was completed 4 times as fast.
An energy and industrial services company needed to degas 10 compartments barge in California. Quick and effectively was required. Envent degassed each compartment in 2 hours, with a 99.9% destruction efficiency.
A tank farm customer requested Envent be onsite for an unscheduled tank refill within 4 hours. Envent was able to respond to the emergency quickly and safely, which saved the customer thousands of dollars in down time.
A customer at a Super Fund Site in Central California needed support to dewater a pit dug in a neighborhood in order to remove contaminated soil. Cost of treating and discharging the water was at a fraction of the cost.
A pipeline company in Northern California needed to blow down their natural gas pipeline for repairs and inspection. Four volume line sweeps were performed to leave the piping free of residual gas.