Project: Condensed Water Removal from Storage Tank. Location: Victoria, Texas. Product: Water contaminated with gasoline range organics. Project finished under the allotted time and achieved a non-detect concentration of VOC’s during the project.

Project: Condensed Water Removal from Storage Tank. Location: Victoria, Texas. Product: Water contaminated with gasoline range organics. Project finished under the allotted time and achieved a non-detect concentration of VOC’s during the project.
Project: Tank Water Treatment and Discharging Onsite. Cost Savings: $250,000. Location: Bakersfield, California. Product: Hydrostatic test water with crude oil residual.
Project: Terminal station tank to be de-inventoried. Cost Savings: $450,000. Location: Louisiana Refinery. Product: Oil and sludge-laden water
Project: Pipeline Hydrotest. Cost Savings: $550,000. Location: Alaska. Product: Hydrotest water with sediment and residual oil.
A pipeline company required emergency treatment and discharge of contaminated water to the Los Angeles City Sanitation system during a construction project. The effluent pipeline water properties varied over time due to numerous drilling and grouting activities occurring upstream of the effluent.
Treat and discharge 3,000,000 gallons of water from a pipeline hydrotest on the North Slope of Alaska. Protected America’s last frontier while minimizing costs.
A refinery requested to do on-site wastewater treatment for a 2,000,000 gallon tank.. Savings of $170,000 was estimated when compared to the transportation and off-site treatment costs.
A Houston-based chemical company had consistent issues with high amounts of suspended solids in their storm water. Removed 90% of the solids which enabled the treatment facility to perform more efficiently.
A customer at a Super Fund Site in Central California needed support to dewater a pit dug in a neighborhood in order to remove contaminated soil. Cost of treating and discharging the water was at a fraction of the cost.