Indiana Refinery Turnaround Emissions Control Flareless H2S – Turnkey Services

Featured Project: Record-Breaking Flareless Turnaround Decontamination – Midwest Refinery (EPA Refinery Sector Rule / MACT 2 Compliance)

A Midwest refinery planned a major turnaround requiring flareless decontamination of multiple critical-path units under the EPA’s Refinery Sector Rule (RSR)40 CFR Part 63 Subpart UUU (Refinery MACT 2). New work-practice standards prohibit routine flaring during MSS activities and require ≥98% destruction efficiency on all depressuring vents.

The refinery needed a complete, single-vendor flareless solution to cut decontamination time from 3 weeks to under 7 days.

The Challenge

  • Multiple high-H₂S process vessels and piping systems
  • No flare capacity allowed under RSR work-practice standards
  • Must meet 40 CFR §63.670(o) flare monitoring & minimization requirements
  • Hot wash water treatment required before discharge
  • Zero safety incidents, zero schedule slippage

Envent’s Integrated Flareless Turnaround Solution

System Equipment & Link Purpose
H₂S Scrubbing 2× ASME-rated ESCRUB recirculating scrubbers >99% H₂S removal from low-pressure vapors
High-Capacity Destruction Multiple EMECS-70 (70 MMBTU/hr) >99.9% DRE of hydrocarbons & residual H₂S
Heat Exchange & Knockout Custom exchangers + KO drums Phase separation & cooling
Contaminated Wash Water Treatment Envent Mobile Wastewater System Oil/TSS/BTEX removal before discharge

Execution Highlights

  • Full integration with refinery hot-wash system
  • Real-time LEL, H₂S, temperature, and flow monitoring
  • 24/7 Envent operators + direct coordination with refinery turnaround team
  • All emissions documented for EPA RSR reporting

Result: Decontamination completed in just 7 days2 full weeks faster than historical baseline.

Proven Results – Fastest Flareless Decon Ever

Benefit Delivered Outcome
Decontamination Time 7 days vs. 21 – new plant record
Flaring Eliminated 100% flareless – full RSR / MACT 2 compliance
Safety Zero incidents across multiple high-H₂S units
Cost & Schedule Millions saved in reduced downtime
Regulatory Assurance Full documentation for EPA & state audits

This remains the fastest documented flareless decontamination of a Midwest refinery under the Refinery Sector Rule.

Planning Your Next RSR-Compliant Flareless Turnaround? Get your Free EPA MACT 2 / RSR Compliance Review & Quote today. Call Envent’s Turnaround Division at 888-997-9465 or email [email protected] — we make 3-week jobs finish in 7 days.