Envent Provides Mobile Vapour Control for Benzene Barge & Railcar Loading – Alberta, Canadian

Executive Summary A major Canadian refinery transitioning to renewable diesel needed mobile vapour degassing of a large butane storage sphere during −30 °C winter conditions, while maintaining full mobile vapor control to prevent any release to atmosphere.

Envent mobilized two CSA-compliant EMECS-70 mobile vapor control systems plus a heated nitrogen generation system in under 24 hours. Result: <1 % LEL in <48 hours, zero visible plume, zero odour complaints, and 100 % compliance with CSA B149.3 and provincial air permits.

Project At A Glance

  • Location: Western Canada
  • Service: Mobile Vapour Degassing + Mobile Vapor Control Systems
  • Challenge: Butane sphere degassing in −30 °C with pyrophoric risk
  • Solution: Dual CSA-certified EMECS-70 + heated N₂ inerting
  • Outcome: <1 % LEL in <48 hrs, zero incidents, ahead of schedule

The Challenge

  • High-LEL butane vapours in large storage sphere
  • Ambient temperatures below −30 °C (risk of ice formation)
  • Pyrophoric iron sulfide – oxygen ingress must stay <12 %
  • Must meet CCME Canada-Wide Standards and provincial air permits
  • No flaring allowed – full mobile vapor control required

Envent’s CSA-Certified Mobile Vapour Degassing & Mobile Vapor Control Solution

Equipment & Envent Service Link Role
Dual CSA-Compliant EMECS-70 70 MMBTU/hr each → >99.9 % DRE of butane vapours
Heated Nitrogen Generation System Pre-heated N₂ injection to prevent condensation & maintain <12 % O₂
Integration with existing flare header Seamless tie-in, zero atmospheric release
24/7 Canadian-certified operators Continuous LEL, O₂, temperature monitoring

Performance

  • Tank brought from 100 % LEL to <1 % LEL in under 48 hours
  • Zero condensation or ice formation in lines
  • Zero odours, zero visible plume, zero complaints

Proven Results – Winter-Ready, Regulator-Approved

Benefit Delivered Outcome
Speed <48 hrs to gas-free (vs. 5–7 days conventional)
Safety Heated N₂ + dual redundancy = zero pyrophoric or freeze-up risk
Compliance 100 % CSA B149.3, CCME, and provincial air permit compliant
Environmental >99.9 % destruction, no flaring, no venting
Operational No delay to renewable diesel transition schedule

This project set the new Canadian benchmark for mobile vapour degassing and mobile vapor control systems in cold-weather butane/LPG service.

Planning mobile vapour degassing or mobile vapor control in Canada? Get your Free CSA-Compliant Plan & Quote today. Call Envent Canada at 888-997-9465 or Request a Quote → — we’re fully CSA-certified and winter-ready.